290 Tonne Vestas Wind Turbines Dropping Like Giant Wounded Flies

STOP THESE THINGS

Vestas_V112-Collapse_preview Vestas V112 takes its head out of the clouds.

****

Our post – Happenstance or Enemy Action? Giant Wind Turbines Collapsing with Alarming Regularity – was barely up a week, and yet another story of a 290 tonne whirling juggernaut crashing back to Earth popped up in Sweden.

This time, another vertically vulnerable Vestas hit the deck – a V112 with three 54.7m blades, weighing in at 11 tonnes a piece, the hub at 45 tonnes (the hub and blades together weigh in at 78 tonnes), the nacelle and its contents – bearings, gearbox, generator etc at more than 80 tonnes – bringing the earth-shuddering total weight at the top-end to a massive 158 tonnes.

Vestas V112

Add a 90m tower – weighing 130 tonnes – and the whole whirling, Danish Dervish weighs in at more than 288 tonnes. The Saturn V Rocket that sent Neil Armstrong & Co to the Moon…

View original post 964 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s